Please read The Target and Phase 1before reading this.
Now that everything is packed and ready to go, this is what we do next. It is called Phase 2a: Sweep and Clear.
- Wake up early in the morning when the sun has just come up. This gives us a full day to work and clear the compound.
- Get everyone together and do stretches to warm everyone up and get them limbered up.
- The next move is to make a "Convoy" of cars. Now you may be thinking, "You can't drive on Z-Day!" or "Where are you going to get Cars?" To answer the first question, remember the train tracks on the photo's in The Target? Well those run RIGHT by my back yard. I mean the only separation is a small hedge. So using the cars from the people who came, and the cars from my neighbors we would drive up onto the tracks and take the short minute drive to the compound. My next door neighbor has a Range Rover which we will use to flatten the hedge before everyone goes over it.
- Once we arrive at the train station, we will have Team A,B,and X grab bags while teams C and D begin work on clearing the parking lot. If there are cars, C team's job will be to hot wire cars and park them in front of all doors and windows, leaving 1 door for letting people in. D's team is to cover them.
- While C and D team's are outside doing that, A,B and X will have just entered the building. B team will break from the group and locate the controls to lower the shutters if they aren't already down. X team, consisting of people who have ailments or disabilities, will be waiting right inside the doors until everyone is done.
- A Team will then begin sweeping through the store in teams of 2, clearing out any infected.
This will take some time to complete but once it is done we will do this:
- When C and D are done outside, merge teams B and C to become the new B Team and assign D team to cover X.
- A and B teams begin second and third sweeps. Even once the area has been deemed all clear, we will keep a rotating watch up just in case there was a hidden infected.
Now that the sweeping and clearing is done, we have work to do inside the compound.